Requirements and Environmental Design for LCD Splicing Wall
Number of views:1787order Release Date:2020-11-26
To ensure the smooth implementation of the LCD splicing wall construction project and the normal operation of the system equipment, the construction of the equipment must meet the following environmental conditions:

1、 Power supply

Considering that the system may encounter special situations where there may be a current surge due to the interruption of power supply, the splicing unit itself has a power protection design to ensure the normal and safe operation of the equipment.

1. The power supply voltage should be stable and reliable, especially to prevent immediate power up after power failure. Therefore, in principle, the power supply of the splicing system must be powered by a corresponding power UPS.

2. The splicing system, image controller, and control PC require in-phase power supply.

3. The system equipment should have good grounding, with a grounding resistance of less than 2 Ω, to ensure that the equipment is not damaged in the event of special conditions such as lightning strikes.

4. The power supply of the system is AC 220V ± 5%; Use a three eye socket with a protective grounding wire; The number of sockets is related to the number of splicing units

2、 Light requirements

1. If the windows in the control room are large, direct sunlight should be avoided and curtains should be used to block the light. The curtains should be dark in color.

2. It is recommended to use recessed tube lights for lighting. The lights should not be directly aimed at the screen direction and should be kept at a distance of 3 meters from the screen to avoid affecting the projection effect.

3、 Air conditioning requirements

1. There should be good temperature control and heat dissipation measures in the maintenance channel behind the splicing screen panel. If it is a central air conditioning system, there should be air conditioning inlet and outlet ports. If there is no central air conditioning system, specialized air conditioning should be added, and the power of the air conditioning system depends on the size of the large screen.

2. The temperature inside the maintenance channel and the temperature in the control room of the splicing curtain wall should be controllable and kept basically the same.

4、 Installation requirements

② The cabinet base is usually in direct contact with the anti-static floor to ensure that the ground can withstand gravity for a long time without deformation.

① The installation ground requires a flat and sturdy surface, strong load-bearing capacity, and is not easily deformed.

5、 Requirements for wiring and trunking

1. If it is a fixed floor such as floor tiles or composite wood flooring, it is required that there is a wiring groove between the signal source (computer RGB signal, video signal) and the control computer to the graphics controller (or projector interface), and the shorter the wiring distance, the better.

2. Weak current cables (RGB, video, network, serial port, mouse and keyboard extension cables, etc.) should be routed separately from strong current cables to avoid signal interference. If using cable trays, it is not possible to share one cable tray, and different cable trays should be used for separate wiring.

3. If it is an anti-static floor, holes should be opened at the wiring outlet to leave cable outlets.

6、 System environment

1. The temperature and humidity of the air conditioner before and after splicing the screen should be adjusted to the same scale to ensure the heat dissipation of the splicing wall and the flatness of the splicing screen

2. The fire sprinkler shall be as far away from the splicing wall as possible, and spray extinguishing agent shall be used.

3. The splicing curtain wall room requires cleanliness and dust prevention.

4. The back of the splicing system is a maintenance channel, and the width of the maintenance channel is generally not less than 0.60 meters

5. Large screen rooms require good temperature and humidity control. The working environment temperature is 0 ℃ -40 ℃, and the relative humidity is 10% -90%. There should be air conditioning behind the spliced curtain wall.

7、 Requirements for decoration and equipment location of operation console (room)

1. The placement of the image controller should be located in the aisle (inside the cabinet) next to or behind the curtain wall, and should be as close as possible to the projection box

2. The control computer should be located as close as possible to the opposite direction of the splicing screen and at a suitable distance from it for debugging, color adjustment, and other operations.

3. The position of the operation control computer should be directly opposite the splicing screen, and it is required that the operator can easily and intuitively see the operation of the splicing screen. If there is a dedicated partitioned operation control room, there should be transparent glass between the operation control room and the large screen display room for easy viewing by the operator.


Contact Us
Address: Building B, Lihao Yongda Technology Park, No.1 Dongfang Avenue, Guangming District, Shenzhen
Phone: 0755-23576861
24-hour service hotline: 139 2371 0018

QR code
CopyRight ? 2017 Shenzhen Jintong Display Technology Co., Ltd. All Right Reserved
展開
  • Tel

  • 075523576861
QR code
主站蜘蛛池模板: 精品久久久久久久久久久aⅴ| 久久久久久久99精品免费观看| 精品一区二区av天堂| 亚洲第一极品精品无码久久| 国产精品美女久久久久久久久 | 久久精品99久久香蕉国产色戒| 亚洲va中文字幕无码久久| 久久久天堂国产精品女人| 最近中文字幕视频高清| 精品国产_亚洲人成在线| 久久只精品99品免费久23| 国产精品自在线拍国产手机版| 亚洲国产精品久久久久久| 解开人妻的裙子猛烈进入| 国产无套内射普通话对白| 国产 | 久你欧洲野花视频欧洲1| 久久精品国产一区二区三区不卡| 两个女人互添下身视频在线观看| 成人免费一区二区三区视频 | 精品国偷自产在线| 久久人午夜亚洲精品无码区| 华人少妇被黑人粗大的猛烈进| 国精产品自偷自偷综合下载| 国产裸拍裸体视频在线观看| 色婷婷综合久久久中文字幕| 国产综合在线观看| 久久av无码aⅴ高潮av喷吹| 18女下面流水不遮图| 婷婷综合久久中文字幕蜜桃三电影| 欧美肥妇毛多水多bbxx水蜜桃| 国产麻豆出品在线观看av| av国产传媒精品免费| 日本巨大的奶头在线观看| av人摸人人人澡人人超碰妓女 | 国产精品亚洲αv天堂无码| 免费a级午夜绝情美女图片| yy1111111少妇影院光屁股| 蜜臀av国产精品久久久久| 欧美黑人性暴力猛交喷水黑人巨大| 亚洲精品夜夜夜妓女网| 少妇被爽到高潮在线观看 |